Loop half of a key9/6/2023 Have identified a process variable we seek to regulate, be able to measure it (or something directly related to it) with a sensor, and be able to transmit that measurement as an electrical signal back to our controller, and ![]() To design and implement a controller, we must: 1) The major components of a control system include a sensor, a controller and a final control element. ![]() ![]() A controller seeks to maintain the measured process variable (PV) at set point (SP) in spite of unmeasured disturbances (D).
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |